Our Project Portfolio

Showcasing our expertise through successful electrical engineering projects across Nigeria

Engineering Excellence Since 2012

Projects by Sector

All Projects
Aviation
Education
Banking & Finance
Industrial
Government
Featured Project Aviation Sector

Federal Airport Authority of Nigeria (FAAN), Lagos

Project Overview

Comprehensive upgrade of power distribution infrastructure at Murtala Muhammed International Airport to ensure uninterrupted power supply for critical aviation operations.

12+
MV RMU Units
3
500KVA Transformers

Key Deliverables

  • Supply of 12 MV Ring Main Units (RMU) for enhanced power distribution
  • Supply and installation of 3 nos. 500KVA 11/.415kV ABB Transformers
  • Integration with existing SCADA systems for remote monitoring
  • Full testing and commissioning of the power network
MV Power Systems ABB Transformers SCADA Integration Power Distribution

Project Visualization: Airport Power Infrastructure

Recent Projects

Aviation 2023

Bi-Courtney Aviation Services

Power network maintenance and upgrades at Murtala Muhammed Airport Terminal 2.

  • Routine maintenance of 11kV ABB VD4 Feeders
  • Repair & Servicing of 4nos 3200A ACB Breakers
View case study
Education 2022

American University of Nigeria

Campus-wide power distribution system upgrade in Yola.

  • Design and assembly of 2500A ACB incomer
  • 2500A TPN Outdoor cubicle type Isolating panel
View case study
Banking 2022

Guaranty Trust Bank

Power system upgrades for multiple branches in South-West Nigeria.

  • Multiple 400A & 630A LV ATS Panels
  • Main LV Distribution Panels
View case study
Industrial 2021

Karma Milk Industries

Power infrastructure for manufacturing facility on Lagos-Ibadan Expressway.

  • 630A Motor Control Centre Panel
  • 1600KVA Medium Voltage Transformer Substation
View case study
Education 2021

Osun State University

Power system installation and upgrade for university campus.

  • Supply of 800A Gear Switch
  • 1600A Change-Over Panel for NEPA & GEN
View case study
Industrial 2020

Cocoa Products (Ile-Oluji)

Power distribution system for cocoa processing facility.

  • 2nos 2500A 3P ACB Incomers
  • 2nos 1250A mechanically interlocked MCCB
View case study

Client Testimonials

FA

Federal Airport Authority

Lagos, Nigeria

"McLauren Engineering delivered exceptional work on our power infrastructure upgrade. Their technical expertise and professionalism ensured minimal disruption to airport operations during the critical upgrade phase."

GT

Guaranty Trust Bank

South-West Nigeria

"We've worked with McLauren Engineering on power solutions for multiple branches. Their attention to detail and commitment to quality has provided us with reliable power systems that meet our banking operations' stringent requirements."

Power Your Projects with Expertise

Partner with Nigeria's leading electrical engineering company for reliable, innovative solutions.

McLauren Engineering Support